Structural Steel Fabrication and Erection

Design, build, and install custom structures for industrial and commercial facilities. Engineers on staff who design, draft, stamp, and pull permits.

Platforms, mezzanines, machine bases, access systems, supports, railings, and architectural steel. Fabricated in Rancho Cordova, installed anywhere inside 600 miles, shipped nationwide.

Fiber laser head tracking across steel plate, cutting a circular blank with the kerf glowing behind the nozzle.
FIBER LASER — PLATE CUT0:08 LOOP · NO AUDIO

Fabrication and welding

Cutting, forming, fitting, and welding in the Rancho Cordova shop, plus elevated field welding on an in-service structure.

  • SHOP WELDING — BENCH WORKM3E-FAB · FIG 01
  • WELDING — BASE CONNECTIONM3E-FAB · FIG 02
  • BEAM WELDINGM3E-FAB · FIG 03
  • WELDING — SHOP TABLEM3E-FAB · FIG 04
  • WELD DRESSING — GRINDERM3E-FAB · FIG 05
  • FABRICATION BAY — CUTTINGM3E-FAB · FIG 06
  • STOCK RACK — SECTION AND TUBEM3E-FAB · FIG 07
  • CUTTING TO LENGTH AT THE RACKM3E-FAB · FIG 08

Steel is the easy part. The stamp, the fit, and the schedule are not.

Three ways a steel package goes wrong, and none of them are about the steel.

It does not pass. You bought a platform from a catalog, the building department wants a stamped calculation for the seismic anchorage, and the vendor cannot produce one because there is no engineer on their staff.

The full detail

It does not fit. The drawings were taken from an as-built that was wrong by 2 inches. The shop built to the drawing. Now the crew is on site with a torch and a grinder, on your clock, in your plant.

It does not show up. The fab shop took the job at a good price, then a bigger job walked in the door, and your platform slid four weeks.

Agitate: Each of those problems is discovered at the worst possible moment, which is when the crane is already scheduled and the equipment is already on the floor. And each one is a scheduling problem before it is a money problem, because the steel is holding up everything downstream: the equipment set, the utilities, the commissioning date.

Solution: We design it, stamp it, build it, and set it. When the field does not match the drawing, the person who can authorize the fix is standing there.

What we fabricate

What we fabricate — Structural Steel Fabrication and Erection
CategoryTypical items
Structural steelBeams, columns, moment frames, bracing, base plates, embeds
Equipment support structuresMachine bases, skid frames, pipe racks, vibration isolation frames
Elevated platforms and mezzaninesWork platforms, equipment platforms, storage mezzanines, catwalks
Access systemsFixed ladders, stairs, handrail, guardrail, roof access hatches
Miscellaneous metalsLintels, curb angles, bollards, grating, floor plate, custom brackets
Architectural steelCanopies, awnings, decks, balconies, panels, gates
Field modificationsElevated field welding, structural modifications to existing steel
Repairs and rehabilitationWater tank structural rehabilitation, corroded member replacement

The stamp

We have engineers on staff that design, draft, and stamp these structures and pull permits if necessary.

That sentence is the reason a lot of clients call. Most fab shops can weld. Far fewer can hand a building department a signed calculation package for a mezzanine with a 125 psf live load and a seismic anchorage detail, then pull the permit and meet the inspector.

Code compliance and stamped drawings

How a steel package runs

  1. Field measure or as-built verification

    We measure what is there rather than trusting a drawing set from 1997.

  2. Design and detailing

    Structural design, connection design, and shop drawings. Stamped where the jurisdiction requires it.

  3. Permit

    Pulled when necessary, with the drawing set the department actually wants.

  4. Shop fabrication

    Cut, fit, weld, and finish in Rancho Cordova.

  5. Finish

    Galvanized, powder coat, primer and paint, or specialty coatings. Finish selection is one of the biggest single cost variables on a steel package.

  6. Delivery and erection

    Our own rigging inside 600 miles. Shipped nationwide when you are erecting it yourself.

Engagement models and coverage

Engagement models and coverage — Structural Steel Fabrication and Erection
You needWe deliverCoverage
Design onlyStamped structural packageNationwide
Design, build, and shipFabricated steel delivered to your siteNationwide
Design, build, and installTurnkey structure, erected600 miles from Sacramento
Install of steel you already boughtErection only600 miles from Sacramento

That fourth row matters. If you already purchased structures and need someone to set them, that is a defined service line, not a favor.

Standard fabricated items have published 2026 prices

Commercial and architectural items come from the 2026 Northern California guide. Fabrication only, installation available after site visit and field review.

Standard fabricated items have published 2026 prices — Structural Steel Fabrication and Erection
Item2026 budget range
Standard steel handrail, 2-line$140 – $185 per linear foot
Guardrail system, 42" OSHA$165 – $225 per linear foot
ADA compliant rail$180 – $240 per linear foot
Light duty mezzanine$18,000 – $35,000
Heavy industrial mezzanine$35,000 – $75,000+
Fixed ladder, 20–30 ft$3,500 – $7,500
Steel framed roof access hatch$3,500 – $8,000

Budget pricing · 2026 Northern California · Not a quote — Fabrication only. Installation available after site visit and field review.

Custom industrial structures, equipment supports, and anything requiring engineering review are quoted individually.

Full 2026 price guide · All fabrication products

Divisions

Related services

Industries

Industries this work runs in

Products

Related fabrication products

Portfolio

Related project work

Coverage

600 mi
Field services, installation, fabrication delivery, and rigging from Sacramento
300 mi
Full EPC delivery and preventative-maintenance programs
Nationwide
Engineering, design, and fabrication for shipment

Check coverage for your site

Common questions

Can you stamp drawings for a permit?

Yes. We have engineers on staff who design, draft, and stamp structures and pull permits when a project requires it. That covers the usual triggers: mezzanines, elevated platforms, equipment support structures with meaningful loads, guardrail on an occupied edge, and anything a building department flags for structural review.

What does structural steel fabrication cost?

Standard commercial items have published 2026 budget ranges, for example 42-inch OSHA guardrail at $165 – $225 per linear foot and a light duty mezzanine at $18,000 – $35,000. Custom industrial steel is quoted per project because the drivers are specific: member sizes, connection complexity, finish, whether it is shop-assembled or field-assembled, and how hard it is to get a crane to the spot. Finish alone can move a package 20% or more.

Do you erect what you fabricate?

Within 600 miles of Sacramento, yes, with our own crews and our own in-house rigging. Beyond that radius we fabricate and ship nationwide and you handle erection, or we provide the design package and a shop closer to you builds it.

Can you work inside an operating plant?

That is a core competency, not an accommodation. Elevated field welding, structural modifications to live equipment, hot-work permitting, fire watch, containment for grinding and welding, and sequencing around production. See equipment installation for how we run work inside occupied facilities.

What finishes do you offer?

Hot-dip galvanizing, powder coat, shop primer with field paint, and specialty coatings for corrosive or sanitary environments. Finish type is listed in the pricing disclaimer as a cost driver for a reason. Tell us the environment, indoor or outdoor, washdown or dry, coastal or inland, and we will recommend rather than default.

How long does a typical steel package take?

It depends on engineering scope, permit review time in your jurisdiction, material availability, and current shop backlog. A straightforward handrail package moves fast. A stamped mezzanine with a permit and a galvanizing cycle is a longer calendar, and most of that calendar is the building department and the galvanizer, not the shop. Ask for a schedule at quote time and we will give you the real one.

Send the drawing, or send a photo and a tape measure reading

Both work. We would rather field-verify than build to a drawing nobody trusts.

Index of sheets

Index of sheets: every page on this site, by sheet number, drawing number, title and revision.
SHT NODWG NOTitle
Cover Sheet
01Home
Services
02M3E-SRV-01Services
03M3E-SRV-02Equipment Installation
04M3E-SRV-03Custom Equipment
05M3E-SRV-04Steel Fabrication
06M3E-SRV-05Specialized Enclosures
07M3E-SRV-06Utility Tie-Ins
08M3E-SRV-07Rigging
09M3E-SRV-08Preventative Maintenance
10M3E-SRV-09EPC
Products
11M3E-PRD-01Products
12M3E-PRD-02Handrails & Guardrails
13M3E-PRD-03Mezzanines
14M3E-PRD-04Ladders & Access Hatches
15M3E-PRD-05Enclosures
16M3E-PRD-06Gates
17M3E-PRD-07Decks & Balconies
18M3E-PRD-08Awnings & Canopies
19M3E-PRD-09Decorative Panels
20M3E-PRD-10Bollards
21M3E-PRD-11Site Amenities
Industries
22M3E-IND-01Industries
23M3E-IND-02Food Processing
24M3E-IND-03Seed Processing
25M3E-IND-04Manufacturing
26M3E-IND-05Packaging
27M3E-IND-06Printing
28M3E-IND-07Chemical Processing
29M3E-IND-08Wastewater
30M3E-IND-09Breweries & Wineries
31M3E-IND-10Universities
Projects
32M3E-PRJ-01Projects
33M3E-PRJ-02OEM Equipment Install
34M3E-PRJ-03Seed Dryers
35M3E-PRJ-04Seed Priming Rooms
36M3E-PRJ-05Explosion Room
37M3E-PRJ-06Barrel Handler
38M3E-PRJ-07Water Tank Rehab
39M3E-PRJ-08Dust Collection
40M3E-PRJ-09Wrap-Around Deck
Service Area
41M3E-SA-01Service Area
42M3E-SA-02Chico
43M3E-SA-03Elk Grove
44M3E-SA-04Folsom
45M3E-SA-05Fresno
46M3E-SA-06Modesto
47M3E-SA-07Napa & Sonoma
48M3E-SA-08Oakland
49M3E-SA-09Rancho Cordova
50M3E-SA-10Redding
51M3E-SA-11Roseville
52M3E-SA-12Sacramento
53M3E-SA-13San Jose
54M3E-SA-14Stockton
55M3E-SA-15West Sacramento
56M3E-SA-16Woodland & Davis
Compliance
57M3E-CMP-01Compliance
58M3E-CMP-02OSHA 1910.28
Company
59M3E-CO-01Pricing
60M3E-CO-02FAQs
61M3E-CO-03About
62M3E-CO-04Contact
63M3E-CO-05Privacy Policy
64M3E-CO-06Terms of Use

Esc to close · Shift + I to reopen