Full EPC Delivery: Engineering Through Startup

From concept and engineering through procurement, fabrication, installation, commissioning, and startup, Miller 3 Engineering provides turnkey industrial delivery with a single point of responsibility for the entire project lifecycle.

One contract. One schedule. One company that cannot point at anyone else.

Multi-prime delivery makes the owner the general contractor

You did not plan to become a project manager. It happened by accretion.

You hired an engineering firm for the design. They finished and left. You bid the fabrication, and the low bidder had questions the engineer no longer answers because their contract closed. You hired a rigger, an electrician, a mechanical contractor, and a controls integrator, each on their own agreement, each with their own schedule assumptions, each of whom sincerely believes their scope starts after somebody else's ends.

The full detail

Agitate: Now every conflict routes through you. Every RFI is your phone call. Every scope gap is your money, because there is no single contract that says whose it was. The engineer's drawings said "by others" eleven times and you are "others."

The schedule does not fail dramatically. It fails two days at a time, at every seam, until the startup date that was in the capital request is a quarter behind and you are the one explaining it.

Solution: One contract that spans concept through startup, held by a company that performs engineering, fabrication, rigging, installation, and utilities in house.

Single point of responsibility for the entire project lifecycle.

Engineering, Procurement, Construction, Project Management, Commissioning and Startup

  1. Revision A: Engineering

    Concept development and problem definition, process and layout engineering, 3D modeling, structural and mechanical design, fabrication-ready drawings, stamped and permitted where required. Early identification of constraints and operational challenges, before they become field problems.

  2. Revision B: Procurement

    Equipment specification, vendor selection, purchase, expediting, and receiving. Long-lead identification at the front of the schedule rather than the middle. We buy it, track it, and take delivery of it.

  3. Revision C: Construction

    Fabrication in our Rancho Cordova shop, structural steel, enclosures, in-house rigging, precision setting, utility tie-ins, and integration. Prefabrication to reduce on-site time and disruption. Sequenced around your production.

  4. Revision D: Project Management

    One project manager, one schedule, one weekly report. Coordination with facility engineering, maintenance, operations, OEMs, and inspectors. Scope boundaries defined in writing at the start, not negotiated at the end.

  5. Revision E: Commissioning and Startup

    Function testing, OEM commissioning support, operator familiarization, punch-list closeout, and handover to operations. We stay until it runs.

300 mi
EPC coverage radius from Sacramento
1
Contract, schedule, and point of responsibility
5
Phases, from concept to startup

What the single contract absorbs

What the single contract absorbs — Full EPC Delivery: Engineering Through Startup
ScopeNormally a separate contractUnder EPC
Process and layout engineeringEngineering firmIncluded
Structural design and stampingStructural engineerIncluded
Equipment procurementOwner or purchasingIncluded
Steel fabricationFab shopIncluded, in house
EnclosuresSpecialty contractorIncluded, in house
Rigging and settingRigging outfitIncluded, in house
Mechanical installationMechanical contractorIncluded, in house
Process piping and utilitiesPlumbing and mechanical contractorsIncluded, in house
Electrical and controlsElectrical contractor and integratorCoordinated
Permits and inspectionsOwner or design teamIncluded
Commissioning supportOEM plus ownerIncluded
Punch-list closeoutEveryone, eventuallyIncluded

When EPC is the right call

  • The project touches structural, mechanical, utilities, and controls at once
  • Your engineering staff is at capacity or does not exist
  • The startup date is committed to someone above you
  • The equipment is long-lead and procurement timing drives everything
  • The facility is live and the sequencing has to be right the first time
  • You have run a multi-prime project before and do not want to again

When it is not: a single defined scope with clear boundaries. If you need a mezzanine, buy a mezzanine. Individual services are available in house without the EPC wrapper.

We hold the EPC radius tighter than the install radius on purpose

Installation and rigging reach 600 miles from Sacramento. EPC reaches 300.

The difference is presence. An install is a defined window with a crew on site. EPC is months of project management, vendor coordination, inspections, and the ability to be at your plant tomorrow because something changed. Promising that at 550 miles would be a sales answer, not an operational one.

Outside 300 miles, we still design nationwide, fabricate and ship nationwide, and install and rig within 600 miles.

Service area and coverage tiers

Divisions

Related services

Industries

Industries this work runs in

Portfolio

Related project work

Coverage

600 mi
Field services, installation, fabrication delivery, and rigging from Sacramento
300 mi
Full EPC delivery and preventative-maintenance programs
Nationwide
Engineering, design, and fabrication for shipment

Check coverage for your site

Common questions

What does EPC actually include that a design-build contract does not?

Procurement. In a design-build arrangement the owner usually still buys the major equipment, tracks it, and takes delivery. Under EPC we specify, purchase, expedite, and receive it, which puts the long-lead risk on the same contract as the schedule that depends on it. EPC here covers engineering, procurement, construction, project management, and commissioning and startup support.

Can you do EPC on a project where the equipment is already purchased?

Yes, and it is common. The procurement phase shrinks to expediting and receiving what you already bought, and the rest of the structure stays the same. If the equipment is already on site, that is really an installation and integration project, which is available within 600 miles.

How do you handle change orders?

Scope boundaries get defined in writing at the start, which is the single biggest determinant of how many changes appear later. When conditions genuinely differ from what was known, we price the change before performing it. Practical, field-driven problem solving is included in our approach and does not generate a change order every time a detail moves.

Who is our point of contact?

One project manager for the life of the project. Coordination with facility engineering, maintenance, operations, OEM representatives, and inspectors runs through that person.

Do you provide stamped drawings and pull permits?

Yes. We have engineers on staff who design, draft, and stamp structures and pull permits when the project requires it. Permits and inspections are inside the EPC scope rather than handed back to the owner.

Bring us the capital request, not the drawing set

EPC pays off earliest. The best time to call is when the project is a paragraph in a budget, before the scope has been split into contracts that no longer fit together.

Index of sheets

Index of sheets: every page on this site, by sheet number, drawing number, title and revision.
SHT NODWG NOTitle
Cover Sheet
01Home
Services
02M3E-SRV-01Services
03M3E-SRV-02Equipment Installation
04M3E-SRV-03Custom Equipment
05M3E-SRV-04Steel Fabrication
06M3E-SRV-05Specialized Enclosures
07M3E-SRV-06Utility Tie-Ins
08M3E-SRV-07Rigging
09M3E-SRV-08Preventative Maintenance
10M3E-SRV-09EPC
Products
11M3E-PRD-01Products
12M3E-PRD-02Handrails & Guardrails
13M3E-PRD-03Mezzanines
14M3E-PRD-04Ladders & Access Hatches
15M3E-PRD-05Enclosures
16M3E-PRD-06Gates
17M3E-PRD-07Decks & Balconies
18M3E-PRD-08Awnings & Canopies
19M3E-PRD-09Decorative Panels
20M3E-PRD-10Bollards
21M3E-PRD-11Site Amenities
Industries
22M3E-IND-01Industries
23M3E-IND-02Food Processing
24M3E-IND-03Seed Processing
25M3E-IND-04Manufacturing
26M3E-IND-05Packaging
27M3E-IND-06Printing
28M3E-IND-07Chemical Processing
29M3E-IND-08Wastewater
30M3E-IND-09Breweries & Wineries
31M3E-IND-10Universities
Projects
32M3E-PRJ-01Projects
33M3E-PRJ-02OEM Equipment Install
34M3E-PRJ-03Seed Dryers
35M3E-PRJ-04Seed Priming Rooms
36M3E-PRJ-05Explosion Room
37M3E-PRJ-06Barrel Handler
38M3E-PRJ-07Water Tank Rehab
39M3E-PRJ-08Dust Collection
40M3E-PRJ-09Wrap-Around Deck
Service Area
41M3E-SA-01Service Area
42M3E-SA-02Chico
43M3E-SA-03Elk Grove
44M3E-SA-04Folsom
45M3E-SA-05Fresno
46M3E-SA-06Modesto
47M3E-SA-07Napa & Sonoma
48M3E-SA-08Oakland
49M3E-SA-09Rancho Cordova
50M3E-SA-10Redding
51M3E-SA-11Roseville
52M3E-SA-12Sacramento
53M3E-SA-13San Jose
54M3E-SA-14Stockton
55M3E-SA-15West Sacramento
56M3E-SA-16Woodland & Davis
Compliance
57M3E-CMP-01Compliance
58M3E-CMP-02OSHA 1910.28
Company
59M3E-CO-01Pricing
60M3E-CO-02FAQs
61M3E-CO-03About
62M3E-CO-04Contact
63M3E-CO-05Privacy Policy
64M3E-CO-06Terms of Use

Esc to close · Shift + I to reopen